HOME      CONTACT      KATE'S GLOBAL KITCHEN      COOKBOOK PROFILES      GLOBAL DESTINATIONS      I LOVE DESSERTS      SHOPPING      SEARCH


 

Kate Heyhoe

Kate's Global Kitchen

 

Global Gourmet's
Kitchen Remodel Series

 
5C
5C
During deconstruction:
These two walls couldn't be knocked down, so we later sealed up the passageway on the left wall near the corner, turning this area into the main walls of the new kitchen. Note the black pipe running vertically in the passageway—this is the vent installed to run from the new kitchen sink up and out through the roof. The large silver area on the right wall is the duct for the fan in the microwave oven, which also vents up and out through the roof.

5D
5D
Same walls, with drywall nailed up and before taping and texturing.

5E
5E
Same walls with early stages of cabinetry partially installed. Note the duct on right wall is a heating duct from the original central heat/AC system.
 

Click here to return to:
Part 5: From Demolition to Drywall

 
 

Global Gourmet's Kitchen Remodel Series
(with Survival Recipes)

 

Copyright © 2001, Kate Heyhoe. All rights reserved.

 


Current Kate's Global Kitchen
Kate's Global Kitchen Archive

 
 
Own Your Kitchen
.

 

This page created March 2001

Top


 

 
 

Global Gourmet®
Shopping
Gourmet Food, Cookbooks
Kitchen Gadgets & Gifts

 

Kitchen & Home
Markdowns

 
.